Land Information

With all three stages now titled and fully landscaped, Panorama is no longer a vision - it’s a thriving coastal neighbourhood taking shape before your eyes. Streetscapes are complete, homes are rising, and many residents have already begun their next chapter here by the bay.

It’s exciting to see our first purchasers bringing their architectural visions to life, creating considered coastal homes that reflect both the landscape and their lifestyle. As construction progresses and more families settle in, a genuine sense of community is emerging, one defined by open skies, sweeping views and a slower, more intentional pace of life.

Read our Settlement Guide for more information about your settlement process.

The Grove

Estimated Certificate of Title Date

Titled

Estimated Settlement Date

August 2024

Stage 1 Compaction Report

Earthworks involves the loosening, removing, depositing, shaping, compacting or stockpiling of existing soil and/or the importation or removal of fill. Site re-grading is carried out to adjust the slope and elevation of the soil.

Earthworks

100% complete


Sewer

100% complete

Each block will be provided with the reticulated sewer services. These pipes are laid in a trench and the area is usually protected by an easement. Reticulated sewerage systems (network of pipes) carry sewage from homes to modern sewage treatment plants.


Once the earthworks and sewer is complete, we then commence the construction of the road base, kerb, footpaths, driveways and other services prior to the placement of the asphalt.

Road infrastructure

100% complete


Water and Gas

100% complete

Gas and potable (drinking) water pipes are installed and each lot has a single connection point.


Located within the verge is the trench that contains electrical cabling. Once this is completed, street lights can be installed. In addition, the fibre optic cable is installed and will be used to provide high speed broadband and telecommunications services to your home.

Electrical and Telecommunication

100% complete


Construction Complete

100% complete

All construction works are completed and council then needs to ensure compliance with any agreements and conditions placed on any planning permit relating to public works and open space provision. This is carried out by a licensed land surveyor.

Aspect Rise Release

Certificate of Title Date

21st August 2024

Estimated Settlement Date

September 2024

Earthworks involves the loosening, removing, depositing, shaping, compacting or stockpiling of existing soil and/or the importation or removal of fill. Site re-grading is carried out to adjust the slope and elevation of the soil.

100% complete

Earthworks


100% complete

Sewer

Each block will be provided with the reticulated sewer services. These pipes are laid in a trench and the area is usually protected by an easement. Reticulated sewerage systems (network of pipes) carry sewage from homes to modern sewage treatment plants.


100% complete

Road infrastructure

Once the earthworks and sewer is complete, we then commence the construction of the road base, kerb, footpaths, driveways and other services prior to the placement of the asphalt.


Water and Gas

100% complete

Gas and potable (drinking) water pipes are installed and each lot has a single connection point.


Electrical and Telecommunications

100% complete

Located within the verge is the trench that contains electrical cabling. Once this is completed, street lights can be installed. In addition, the fibre optic cable is installed and will be used to provide high speed broadband and telecommunications services to your home.


Construction Complete

100% complete

All construction works are completed and council then needs to ensure compliance with any agreements and conditions placed on any planning permit relating to public works and open space provision. This is carried out by a licensed land surveyor.

Viewhaven Release

Estimated Certificate of Title Date

Titled

Estimated Settlement Date

November 2024

Earthworks involves the loosening, removing, depositing, shaping, compacting or stockpiling of existing soil and/or the importation or removal of fill. Site re-grading is carried out to adjust the slope and elevation of the soil.

100% complete

Earthworks


100% complete

Sewer

Each block will be provided with the reticulated sewer services. These pipes are laid in a trench and the area is usually protected by an easement. Reticulated sewerage systems (network of pipes) carry sewage from homes to modern sewage treatment plants


100% complete

Road infrastructure

Once the earthworks and sewer is complete, we then commence the construction of the road base, kerb, footpaths, driveways and other services prior to the placement of the asphalt.


Water and Gas

100% complete

Gas and potable (drinking) water pipes are installed and each lot has a single connection point.


Electrical and Telecommunications

100% complete

Located within the verge is the trench that contains electrical cabling. Once this is completed, street lights can be installed. In addition, the fibre optic cable is installed and will be used to provide high speed broadband and telecommunications services to your home.


Construction Complete

October 2024

All construction works are completed and council then needs to ensure compliance with any agreements and conditions placed on any planning permit relating to public works and open space provision. This is carried out by a licensed land surveyor.

Seascape Release

Estimated Certificate of Title Date

25 October 2024

Estimated Settlement Date

November 2024

Earthworks involves the loosening, removing, depositing, shaping, compacting or stockpiling of existing soil and/or the importation or removal of fill. Site re-grading is carried out to adjust the slope and elevation of the soil.

100% complete

Earthworks


100% complete

Sewer

Each block will be provided with the reticulated sewer services. These pipes are laid in a trench and the area is usually protected by an easement. Reticulated sewerage systems (network of pipes) carry sewage from homes to modern sewage treatment plants


100% complete

Road infrastructure

Once the earthworks and sewer is complete, we then commence the construction of the road base, kerb, footpaths, driveways and other services prior to the placement of the asphalt.


Water and Gas

100% complete

Gas and potable (drinking) water pipes are installed and each lot has a single connection point.


Electrical and Telecommunications

100% complete

Located within the verge is the trench that contains electrical cabling. Once this is completed, street lights can be installed. In addition, the fibre optic cable is installed and will be used to provide high speed broadband and telecommunications services to your home.


Construction Complete

October 2024

All construction works are completed and council then needs to ensure compliance with any agreements and conditions placed on any planning permit relating to public works and open space provision. This is carried out by a licensed land surveyor.