Land Information
With all three stages now titled and fully landscaped, Panorama is no longer a vision - it’s a thriving coastal neighbourhood taking shape before your eyes. Streetscapes are complete, homes are rising, and many residents have already begun their next chapter here by the bay.
It’s exciting to see our first purchasers bringing their architectural visions to life, creating considered coastal homes that reflect both the landscape and their lifestyle. As construction progresses and more families settle in, a genuine sense of community is emerging, one defined by open skies, sweeping views and a slower, more intentional pace of life.
Read our Settlement Guide for more information about your settlement process.
The Grove
Estimated Certificate of Title Date
Titled
Estimated Settlement Date
August 2024
Stage 1 Compaction Report
Earthworks involves the loosening, removing, depositing, shaping, compacting or stockpiling of existing soil and/or the importation or removal of fill. Site re-grading is carried out to adjust the slope and elevation of the soil.
Earthworks
100% complete
Sewer
100% complete
Each block will be provided with the reticulated sewer services. These pipes are laid in a trench and the area is usually protected by an easement. Reticulated sewerage systems (network of pipes) carry sewage from homes to modern sewage treatment plants.
Once the earthworks and sewer is complete, we then commence the construction of the road base, kerb, footpaths, driveways and other services prior to the placement of the asphalt.
Road infrastructure
100% complete
Water and Gas
100% complete
Gas and potable (drinking) water pipes are installed and each lot has a single connection point.
Located within the verge is the trench that contains electrical cabling. Once this is completed, street lights can be installed. In addition, the fibre optic cable is installed and will be used to provide high speed broadband and telecommunications services to your home.
Electrical and Telecommunication
100% complete
Construction Complete
100% complete
All construction works are completed and council then needs to ensure compliance with any agreements and conditions placed on any planning permit relating to public works and open space provision. This is carried out by a licensed land surveyor.
Aspect Rise Release
Certificate of Title Date
21st August 2024
Estimated Settlement Date
September 2024
Earthworks involves the loosening, removing, depositing, shaping, compacting or stockpiling of existing soil and/or the importation or removal of fill. Site re-grading is carried out to adjust the slope and elevation of the soil.
100% complete
Earthworks
100% complete
Sewer
Each block will be provided with the reticulated sewer services. These pipes are laid in a trench and the area is usually protected by an easement. Reticulated sewerage systems (network of pipes) carry sewage from homes to modern sewage treatment plants.
100% complete
Road infrastructure
Once the earthworks and sewer is complete, we then commence the construction of the road base, kerb, footpaths, driveways and other services prior to the placement of the asphalt.
Water and Gas
100% complete
Gas and potable (drinking) water pipes are installed and each lot has a single connection point.
Electrical and Telecommunications
100% complete
Located within the verge is the trench that contains electrical cabling. Once this is completed, street lights can be installed. In addition, the fibre optic cable is installed and will be used to provide high speed broadband and telecommunications services to your home.
Construction Complete
100% complete
All construction works are completed and council then needs to ensure compliance with any agreements and conditions placed on any planning permit relating to public works and open space provision. This is carried out by a licensed land surveyor.
Viewhaven Release
Estimated Certificate of Title Date
Titled
Estimated Settlement Date
November 2024
Earthworks involves the loosening, removing, depositing, shaping, compacting or stockpiling of existing soil and/or the importation or removal of fill. Site re-grading is carried out to adjust the slope and elevation of the soil.
100% complete
Earthworks
100% complete
Sewer
Each block will be provided with the reticulated sewer services. These pipes are laid in a trench and the area is usually protected by an easement. Reticulated sewerage systems (network of pipes) carry sewage from homes to modern sewage treatment plants
100% complete
Road infrastructure
Once the earthworks and sewer is complete, we then commence the construction of the road base, kerb, footpaths, driveways and other services prior to the placement of the asphalt.
Water and Gas
100% complete
Gas and potable (drinking) water pipes are installed and each lot has a single connection point.
Electrical and Telecommunications
100% complete
Located within the verge is the trench that contains electrical cabling. Once this is completed, street lights can be installed. In addition, the fibre optic cable is installed and will be used to provide high speed broadband and telecommunications services to your home.
Construction Complete
October 2024
All construction works are completed and council then needs to ensure compliance with any agreements and conditions placed on any planning permit relating to public works and open space provision. This is carried out by a licensed land surveyor.
Seascape Release
Estimated Certificate of Title Date
25 October 2024
Estimated Settlement Date
November 2024
Earthworks involves the loosening, removing, depositing, shaping, compacting or stockpiling of existing soil and/or the importation or removal of fill. Site re-grading is carried out to adjust the slope and elevation of the soil.
100% complete
Earthworks
100% complete
Sewer
Each block will be provided with the reticulated sewer services. These pipes are laid in a trench and the area is usually protected by an easement. Reticulated sewerage systems (network of pipes) carry sewage from homes to modern sewage treatment plants
100% complete
Road infrastructure
Once the earthworks and sewer is complete, we then commence the construction of the road base, kerb, footpaths, driveways and other services prior to the placement of the asphalt.
Water and Gas
100% complete
Gas and potable (drinking) water pipes are installed and each lot has a single connection point.
Electrical and Telecommunications
100% complete
Located within the verge is the trench that contains electrical cabling. Once this is completed, street lights can be installed. In addition, the fibre optic cable is installed and will be used to provide high speed broadband and telecommunications services to your home.
Construction Complete
October 2024
All construction works are completed and council then needs to ensure compliance with any agreements and conditions placed on any planning permit relating to public works and open space provision. This is carried out by a licensed land surveyor.